Tuesday, May 25, 2010

Uncabling the MoNA array

On our first day at the NSCL (Monday May 24), along with other members of the MoNA collaboration, including several other undergraduate students, we removed all of the signal and high voltage cables from MoNA in order to reconfigure and move the array.

To keep the cables from getting tangled up, they had to be draped on the floor as they were removed. After a full morning of this work, we took a break for lunch with group members at Owens Hall dining center.

Artemis Spyrou moves part of the array into place. Cables are draped over the floor to keep them organized.

Second day of MoNA reconfiguration, Tuesday May 25. Group members work to align and position the two array halves

Thomas Baumann, Jim Brown, and Jesse Snyder lift one section of the array to the beam height

No comments:

Post a Comment