Monday, May 31, 2010

Re-stacking MoNA

This post is a little out of order, since this activity occured Monday, May 24 and Tuesday May 25. After de-cabling MoNA, we proceeded to re-stack the detectors into two separate arrays, each 8 detectors tall and 9 layers deep, before jacking the arrays to their proper height.

Amanda and Alegra working on the other side of MoNA viewed through the taller array walls, and Warren helping with the de-cabling

The re-stacking - shifting bars from the top layers to produce additional shorter layers

Positioning the bars to be lined up properly, and carefully negotiating the taller bars past the support posts

Alegra adjusting one of the stacked bars, and Amanda and Alegra helping to organize the loose cables

The two array halves elevated to height using stacking bricks, Shea's new cable outfit, and Michelle stepping lightly over the cabled floor

No comments:

Post a Comment